Multimedia: VideosIntegration and Testing

Integration and Testing: March 15-24, 2017

Activities in Integration and Test this week included preparations for the propulsion test and fit checks.

Downloads: Mobile SD HD

Integration and Testing: February 27-March 3, 2017

Testing for the FM scenario as well as Guidance and Control phasing for the star trackers were key activities this week.

Downloads: Mobile SD HD

Integration and Testing: October 31-November 4, 2016

Fit checks continued this week of SPP Integration and Testing as well as the heater integration.

Downloads: Mobile SD HD

Integration and Testing: December 5-9, 2016

A busy week of testing that included removing panels and conducting RF checks.

Downloads: Mobile SD HD

Integration and Testing: October 10-14, 2016

Integration and Test activities continue with Radio Frequency (RF) testing and the installation of the inertial measurement unit (IMU) which is used for maneuvering the spacecraft as a component of the guidance and control subsystem.

Downloads: Mobile SD HD

Integration and Testing: October 24-28, 2016

Harness work for the wires and connectors continues as well as the installation of the Remote Interface Unit (RIU) which provides system temperatures and voltage to the on-board computer.

Downloads: Mobile SD HD

Integration and Testing: October 17-21, 2016

Radio Frequency (RF) testing continues along with harness work and installation of the spacecraft's reaction wheel Assemblies

Downloads: Mobile SD HD

Integration and Testing: October 3-7, 2016

Solar Probe Plus this week focused on the installation of the star trackers and closing up the spacecraft for alignment measurements.

Downloads: Mobile SD HD

Integration and Testing: September 26-30, 2016

A busy integration and test flow continues this week with antenna mounting and X-Band RF system testing.

Downloads: Mobile SD HD

Integration and Testing: September 19-23, 2016

This week focused on the spacecraft's communications, installation of radios and traveling wave tube amplifiers (TWTA).

Downloads: Mobile SD HD

Integration and Testing: September 12-16, 2016

The major activities focused on the radio integration, harness dressing and the latch valve connector changeout.

Downloads: Mobile SD HD

Integration and Testing: June 20-23, 2016

The primary structure arrived with a week of contamination inspection and preparations continue for the propulsion system thermal vacuum verification testing.

Downloads: Mobile SD HD

Multimedia: VideosHot Shots

Top Deck Cooling System Installation

Hot Shot Video: Top Deck Cooling System Installation

Downloads: Mobile SD HD

Main Flight Harness Installation

Main Flight Harness Installation

Downloads: Mobile SD HD

NASA Logo Solar Probe Plus Logo

© 2017 The Johns Hopkins University Applied Physics Laboratory LLC. All rights reserved.
11100 Johns Hopkins Road, Laurel, Maryland 20723
240-228-5000 (Washington, DC, area) • 443-778-5000 (Baltimore area)